- Plumbed a new drain line for the kitchen sink
- Plumbed new hot and cold water lines (PEX) for the kitchen sink
- Installed a dishwasher
- Installed flooring in the kitchen and dining room
- Installed about 75 percent of the base molding in the kitchen and dining room
- Painted the walls and ceiling in the kitchen and dining room
- Probably some other things that I forgot to include here
There are still a few things to do, but we're getting close! The next post may be the official 'after' pictures, but that will be a while as work is calling once more.