Despite my lack of recent posts, I've been quite busy. Between working 40 hours per week as a carpenter and putting in up to 30 more working on my own house, finding time to take pictures and write blog posts has been difficult. Without further ado, here's the best before and after picture comparisons.
|
Before |
|
After |
Of course, that's just one side. The shower took the most work.
|
Before |
|
After |
And a little paint and pallet wood accent wall really spiffed up the toilet alcove.
|
Before |
|
After |
The major pieces of this project were re-plumbing everything, redoing all the lighting, installing cabinets, tiling the floor, refinishing the tub, tiling the tub surround, and building the accent wall. If it wasn't for a handful of termites discovered in some of the pallet boards and the mank discovered in the wall behind the shower, everything would have gone real smoothly. As it was, I had to rebuild both mirrors and part of the pallet wall. I also used pallet boards as base molding. Other than having an electrician help out with some of the wiring and the countertop supplier install the countertop, I did everything else. The total cost of the bathroom remodel was $6,815, which includes all new appliances, and fixtures.
So, we've got a beautiful new bathroom, finished just in time to move to California and rent our house out (more on that in the next post).
No comments:
Post a Comment